Throughout the existence of the purely Czech professional hydraulic company KGF, we have carried out hundreds of events for our customers, both small companies and for the largest construction companies in the Czech Republic, Slovakia, and abroad. We have participated in or directly completely managed many bridge lifting operations, both small and very large and huge structures. We can also lift non-traditional things, such as roofs without dismantling them, etc. Our list of events is really very diverse, so we present some of them for your reference:
To reduce vertical vibrations and significantly increase comfort for pedestrians and cyclists, in January 2023, we designed, manufactured and, in cooperation with the bridge supplier, installed a tuned mass damper with the following parameters for the footbridge over the Svitava River in Bílovice nad Svitavou:
TMDV-350-2.93
|
Oscillating weight |
350 kg |
|
Total weight |
440 kg |
|
Natural frequency |
2.93Hz |

For the new footbridge over the Jizera River in Mladá Boleslav, which connects the Krásná louka area with the right bank of the Jizera River and the Škoda Auto development center, we manufactured and, in cooperation with the main supplier of the footbridge, installed a total of 8 pieces of tuned mass dampers (vibration absorbers) with the following parameters:
TMDV-1000-2,015 2 pieces
|
Oscillating weight |
1,000 kg |
|
Total weight |
1,100 kg |
|
Natural frequency |
2.015 Hz |
TMDV-450-3.81 4 pieces
|
Oscillating weight |
450 kg |
|
Total weight |
530 kg |
|
Natural frequency |
3.81 Hz |
TMDV-400-4.63 2 pieces
|
Oscillating weight |
400 kg |
|
Total weight |
480 kg |
|
Natural frequency |
4.63Hz |
Despite the relatively complex structure of the bridge deck, these vibration absorbers were incorporated without significantly disrupting the architectural appearance of the footbridge. Judge for yourself.




We cooperate with Swietelski very often, this company uses our hydraulic sets from KGF Hydraulika in their railway and bridge construction. For the event of lifting the Čekanický Bridge, we used our innovative device, the KGF synchronous device with electronic stroke measurement. This device significantly speeds up the work process and significantly increases overall safety. The measurement is of course carried out wirelessly by transmission to a PC, where it is possible to precisely control the parameters that we have set and we can monitor the overall course of the event. Of course, there is an electronic protocol with graphic output.





On the Otava River, we developed, manufactured and also installed 4 pieces of hydraulic shock absorbers TK10-150 with a damping force of 4 x 100 kN and a stroke of 1500 mm. The purpose of the shock absorbers is to dampen longitudinal horizontal vibrations of the bridge structure.





We were given the task of lifting a large coal mining machine by approximately 10 - 15 cm to repair a ball bearing. We used top-of-the-line equipment consisting of 16 short cylinders with a lock nut, type KM 200 - 150 HS, with a total lifting capacity of 3200 tons, a 700 bar motor pump with a power of 7.5 kW, and a distribution control device including hoses and accessories.







The list of individual references is really large and, if you are interested, we can provide you with many more to make sure you are dealing with top professionals in the field.
We produced four vertical tuned mass dampers for the Troja Bridge over the Vltava River in Prague:
TMDV- 1250-1.62 2 pieces
|
Oscillating weight |
1,250kg |
|
Total weight |
1,500 kg |
|
Natural frequency |
1.62Hz |
TMDV- 1250-1.85 2 pieces
|
Oscillating weight |
1,250kg |
|
Total weight |
1,500 kg |
|
Natural frequency |
1.85Hz |
We installed, adjusted and successfully tested the shock absorbers.




KGF hydraulika s.r.o.
Bohunická 1a/743
619 00 Brno
e-mail: info@hydraulika-kgf.cz
mobile: +420 608 072 710
phone: +420 543 245 870
Copyright © 2025 KGF hydraulics - hydraulic cylinders and pumps from the Czech Republic.